In this section:





Road Transportation and Safety

Major Schemes at Pre-Planning Stage

Consultants were appointed to progress the N17 Collooney/Charlestown project to EIS and CPO stage.

During 2001 the N4 Cloonamahon/Castlebaldwin project was advanced to route selection stage.

N4 Inner Relief Road - County Extension

Archaeological investigation continued and contract documents were prepared by consultants with a view to going to contract in 2002.

The pre-planning/design contracts are managed ‘in-house’ by Sligo County Council in conjunction with the National Roads Authority.

National Primary Improvement Works

This programme continued with over €2million spent in 2001 on improvement and upgrading works on National Primary Routes. Work included re-alignment and quality overlay of the N15 North of Grange, traffic calming in Cliffoney, and strengthening of other sections of the Primary Routes.

Improvements were also carried out on the National Secondary routes, with approx. €500,000 being spent on an overlay project west of Dromore West. 

Non National Roads

Sligo County Council spent in the region of e9 million in 2001 on the maintenance and improvement of the non-national road network. Approximately €25 million has been invested in county Sligo’s non-national road network since the commencement of the Restoration programme in 1995. To date approximately 65% of the non-national road network has been restored.

Discretionary Improvement Grants

This scheme provides for the removal of bad bends, improvement of sight lines, footpath and public lighting improvement and bridge repairs.

Footpaths were upgraded on the entrance to Ballymote under this scheme, and new footpaths on the R284 near Carraroe Church. Work has also being completed at the junction of R286 and Shaw’s Avenue in Hazelwood.

Special Improvement Grants (Eu-Co Financed Grants)

This scheme allows for the upgrading of the non-national road network; Works carried out in 2001 included…

Pre-planning and design are at an advanced stage for the following schemes, and it is expected that they will progress to CPO stage in 2002..

Low Cost Accident Reductions Scheme

The ‘Government’s strategy on Road Safety 1998 – 2002’ aims to reduce the rate of road fatalities by 20% over the 5 year period. The scheme was initially targeted on the national road network, but the Department of Environment and Local Government has allocated funding to Local Authorities for works on the non-national roads.

Under the scheme specific accident locations are identified and improved, particularly junctions of major and minor roads. In 2001 work was carried out at Scurmore Enniscrone at the junction of the R297 and Quay Road.

A) Non- National Road Restoration Programme Progress Report

Year Improvement
(S.R + R.R),Km
Maintenance(S.D) Km. Expenditure in IR£
1995 21 36 475,082
1996 86 88 1,207,000
1997 137 91 2,390,901
1998 196 82 3,152,113
1999 213 101 3,479,636
2000 207 98 3,868,568
2001 197 83 4,248,523
Total 1057   579 18,821,823

Total Improved and Surfaced Dressed = 1636/2494 = 65.59%
Total Improved = 1057/2494 = 42.38%
Total Surface Dressed = 579/2494 = 23.21%
Total Length of non-national roads in Co. Sligo =2,494 Km.

(B) Class 3 Supplementary Roads Grant Programme Sligo Co. Council 1997-2001 Progress Report

Year  IR£  Length in Km % of Total
1997 194,744 25 3.6
1998 0 0 0
1999 195,850 25 3.6
2000 175,668 25 3.6
2001 184,000 25 3.6
Total  750,262  100 14.4

Total length of Class 3 in County Sligo = 682 Km
Total improved to date = 100 km = 14.40% of total Class 3 or 4.0% of non- national total.

Summary
Programme Length Improved Km % Total Expenditure £IR
A 1636 65.59 18,821,823
B 10 4.00 750,062
Total 1736 65.59 19,571,885



National Routes

National Primary
Route Description Length in Km
N4 Boro Boundary to Roscommon Co. Boundary 33.3km
N15 Boro Boundary to Bunduff Br. 26.4km
N16 Boro Boundary to Leitrim Co. Boundary 8.4km
N17 Collooney to Bellahy 34.6km
Total 102.7km

National Secondary
Route Description Length in Km
N59 Ballysadare to Mayo Co. Boundary 47.4km



Non National Routes

Regional Routes
Route Description Length in Km
R279 Cliffoney to Mullaghmore 4.4km
R284 Carrowroe to Rosc. Co. Boundary 26.6km
R286 Boro. Boundary-Leitrim Co. Bndy. 8.1km
R287 Carrowroe- Leitrim Co. Bndy. 11.9km
R290 Rathrippon-Ballintogher. 11.0km
R291 Boro. Bndy. –Rosses Pt. 6.5km
R292 Boro. Bndy.- Strandhill –Ballydrehid 16.3km
R293 Ballinaboll –Gurteen-Rosc. Co. Bndy. 25.8km
R294 Cloonloo-Tubbercurry-Lough Talt 42.5km
R295 Ballymote-Keash-Rosc. Co. Bndy. 14.6km
R296 Ballymote-Bunninaddan-R294 10.2km
R297 Dromore W.-Enniscrone-Co. Bndy. 29.8km
R298 N59-Lacknatlieva-R297 4.9km
R361 Roscommon Co. Bndy.-Killaraght-Rosc.Co 1.6km
Total 214.2.km

Local Routes
Class Length in Km % of Total Total km
1 590.0 25.9
2 1008.0 44.2
3 682.0 29.9 2279.5km

Route Length in km % of Total
Nat P. 102.7 3.9
Nat Sec. 47.4 1.8
Regional 214.2 8.1
Local 2279.5 86.2
Total 2,643.8km 100