Stage 2 - Kilsellagh Water Treatment Plant Design Objectives
To Provide for the Construction of a new Water Treatment Works in Accordance with the EU (Drinking Water) Regulations, 2000 S.I. No. 439 of 2000, replacing existing facility which was provided in 1970 comprising microstraining and chlorine and fluorine dosing
To ensure compliance with the maximum admissible concentrations (MAC) for colour, manganese and iron and to eliminate the threat from concentrations of trihalomethanes (THMs)
Kilsellagh Water Treatment Plant
Safe yield 1976 Preliminary Report, 5,800 m3 /day
Proposed Design 4,540 m3 /day working in tandem with the new treatment works at Foxes Den and Carns Hill
Present Demand 7,200 m3 /day or 124% of Safe Yield
6,380 m3 /day to Sligo Urban
820 m3 /day to Rosses Pt, Ballincar
Planning Permission 400 m3 /hr with a min. capacity of 4,540 m3 /day granted 4th Oct ’02
The Plant will have the capacity to deliver 8,000 m3 over a 20 hr period with the provision of a 2,200 m3 storage reservoir
This reservoir is supplemented by the existing storage reservoirs at Faranacardy (5,860 m3), Cregg (545 m3) and Rosses Pt (1,300 m3)
Project Update
Review of PR (August 1999)
Review of Water Quality and demand projections
Review of Statutory Approvals and CPO
Site Investigations
Risk Assessment
Preparation of Contract Documents (Performance Specification)
WSPP Report for all stages
Project Supervisor Design Stage
Pre-Qualification
Tender Process and Assessment
Review of Contractor’s Submission
Contract Supervision & Reporting
Payment Certification & Final Account
Project Goals
Treatment Works (400m3/hr) by DBO Contract
Complete access road from Kilsellagh Dam Site
Connection to new pipelines, upstream and downstream
Provide Service Reservoir (2,200m3)
Provide for Booster Pumping Station for GWSS
20 Year Operate & Maintain Period
DBO Contract Issues
Water Demand Projections
Robust Raw Water Characterisation
Performance Standards
Risk Assessment / Allocation
Detailed Site Investigations
Statutory Approvals
Environmental Issues
Safety
DBO Procurement Issues
Prequalification Procedure
Vitally Important
Robust Technical and Financial Assessment of Candidates required
Tender Assessment
Generally 3 months minimum
ROBUST !! – could be challenged
Whole Life Costs
Water Services Pricing Policy
Charging Structure
Circulars Consolidated L16/02
Industry / Commercial
Capital Cost
Water Treatment Plant
Reservoirs & Booster Stations
Pipelines
O&M Cost
Water Treatment Plant
Pumping Stations
Capital Replacement Fund
Model Agreements
Impact on Local Authority Financing
Water Demand Projections
Gravity Source
Safe Yield 5,800m3/d
Current Output 7,200m3/d
Nominal Rated Output 4,540 m3/d
Maximum Design Output 400m3/h
(8,000m3/d winter)
Raw Water Characterisation & Treated Water Standards
Water Sampling Programme 1990 / 1991
A2 Quality Source
S.I No. 439 of 2000
Initiate New Raw Water Sampling Programme Sept ‘04