It is planned to transport components for a wind farm from Killybegs, Co. Donegal to Oweninny, Bellacorick, Ballina by road during the period 6/1/2019-31/5/2019 approximately.

The loads will be travelling from Sunday night (leaving Killybegs ) to Friday mornings.

The loads are wide - up to 4.5 metres wide and long (up to 66 metres or 216 feet) approximately.

Traffic delays are expected while the loads are travelling along the roads.

The route through Sligo is N15 - Cliffoney to Sligo, N4 - Sligo to Ballysadare and N59 - Ballisodare to Ballina.

All loads will be under Garda escort.

It is proposed to leave Killybegs at 10pm (first load leaving 6/1/2019) and the loads are expected in Cliffoney at midnight approximately and be in Ballysadare at 1am approximately and then travel onto Ballina via N59.

Loads are expected to be in Bellacorick (on site) by 5am-5.30am approximately.